Industrial History Online

Recording Our Industrial Heritage

Images from the IHO Archive

Industrial History Online

Recording and Communicating Our Industrial Heritage

Images from the IHO Archive

The IHO database currently contains 21912 records and 6249 images

Ferrybridge A - Knottingley

One of the two three-stage turbo-alternator sets installed in 1927 at the Ferrybidge power station. Running at 3000 rpm, each set could develop a maximum of 19 MW continuous load. Taken from 'The Engineer' of October 28th 1927.

Date 1927

Grid Reference:- SE 4819 2473

Search the Sites Database

View the Image Gallery by County

Search the Image Collection

Industrial History Online is hosted by the Yorkshire Archaeological & Historical Society and is supported by the following Societies