Industrial History Online

Industrial History Online

Ferrybridge A

Caption :- One of the two three-stage turbo-alternator sets installed in 1927 at the Ferrybidge power station. Running at 3000 rpm, each set could develop a maximum of 19 MW continuous load. Taken from 'The Engineer' of October 28th 1927.

Media Reference :- Ferrybridge_A_Turbine.jpg
Key Words :- steam turbine alternator power generating station
Original Media Date :- 1927
Media Source:- Source - Grace's Guide
Media URL :- Source - Grace's Guide to British Industrial History

Help us improve this entry

The compilers welcome corrections or additional information on all sites. Any information provided will be verified before appearing on the web site.

Email Comments or Query Image Availability